Guide 2 of 5 Getting started

Add your first action

Capture something to do, give it a date, and complete it.

  • iPhone
  • iPad
  • Mac
Button placement varies by device.

Use the plus (+) button to create an action, give it a short title, and choose a date if you have one in mind. Save it, and you have something you can come back to.

I find it easier to start with a small, concrete action. “Prepare workshop slides” gives you a much clearer next step than “Workshop”. You can add more detail as you go.

Capture an action

Pick one thing you want to do. It can be work, something at home, or a thought you don’t want to lose.

  1. Open Aida and use the plus (+) button for a new action.
  2. Enter a title, such as “Prepare workshop slides”. If the editor offers an item type, keep it as Action.
  3. Add a note if it will help when you return. For example, “Include the new demo and a short introduction”.
  4. Check the date and project before saving. Aida can use the view you started from to fill in these details.

You don’t have to organize the whole project before capturing the first action. A useful title is enough to begin.

Choose a date

The date describes when you plan to do the action. If you want to prepare the slides tomorrow, choose tomorrow even if the workshop itself is later in the week.

  1. Open the action’s date controls. On iPhone and iPad, look for When.
  2. Choose Today, Tomorrow, or a date from the date picker. Set a time if you want to be more specific.
  3. If you’re ready to do it but haven’t chosen a day, use Anytime. If it’s something to consider later, use Someday.
  4. Save the action using the editor’s confirmation control. On iPhone and iPad, this is the checkmark button.

The checkmark that saves the editor and the circle that completes an action do different things. Saving keeps your changes; completing records that the work is finished.

Edit and complete it

Open the action again whenever you need to change its title, notes, date, or project. Your first plan doesn’t need to be your final one.

  1. Find the action in Planner on its chosen date, or in the list or project where it belongs.
  2. Open it, make a small change, and save.
  3. When you’ve done the work, use the completion circle beside the action to mark it complete.

What you’ll see when you’re done

You’ve captured an action, chosen when to do it, and learned how to edit or complete it. You can repeat that same small process for the next thing on your mind.

A few things you might be wondering

Why isn’t my action in today’s Planner?

Check its date. An action scheduled for another day belongs on that day; an Anytime or Someday action can be found in the corresponding list in Projects.

Do I have to choose a project?

No. Actions without a project appear in Inbox. You can assign a project later.